Tampilkan postingan dengan label stuff. Tampilkan semua postingan
Tampilkan postingan dengan label stuff. Tampilkan semua postingan

Rabu, 23 November 2016

Lounge Furniture Ordered

After much deliberation the sofas have been ordered.  In the end war was averted.

 We have 2 of these on the way

Also ordered today is the TV unit.


I have been working on the water tank, my brother the stone mason came Monday to do the template for the kitchen worktops.  We are having Star Galaxy.

Easy to see how it gets its name

I have started building the bedroom furniture now, all the kitchen appliances are on order, the bow thruster is in but I am waiting for the cables to be made before I blog it.

So things are moving in many directions and I can definitely see the light at the end of the tunnel.  So much so I am now searching for moorings.


Read More..

Minggu, 26 Juni 2016

Stuff Is Arriving

Sam the canvas man arrived today for the second fitting of the pram cover.  The design of the cover will permit the screen to remain in place with the cover completely down but can also be lowered or fully removed if required.

 There will be more side windows on the finished cover
and a dodger around the base

 The front screen

I also collected the oak doors from the carpenters today.  The small set will replace the steel ones in the forward bulkhead.  The tall ones are the bedroom and bathroom doors.




While Sam was working on the cover I cut out all the holes for the additional electronics to be fitted. Photo of this in a few days when they are fitted.
Read More..

Selasa, 31 Mei 2016

Shiny Stuff

I have been working with the pram cover maker to make the stainless steel tube frame to take the cover.  Normally he contracts this to a SS specialist.  He normally makes a light alli tube frame as templates then the SS guy does his bit.  Between us we have made the frame combining his know how and my metal skills.  This has saved over £500 in labour. So under the white cover at the back I now have a fully collapsible frame.  IMO the SS guy is on a nice little number.  The 316 SS tube was a dream to work. 

 The screen frame

 The front screen will be a self supporting structure.
More on this when it gets fitted

 Port side


The other shiny bits added are the mushroom vents.  Its one of those jobs I have held back to when I had nothing much else to.  Currently I am waiting for the internal doors and frames and the front doors.  I should get these next week.

6 fitted and one to do later once the hatch is finally fitted

If you look closely you can see the 3G aerial behind the 3rd vent.  The yellow bit is a cover blocking off the hole for the gas fire flue.
Read More..
 
boat design plans - Powered By Blogger