D Day The Steel arrives Eventually !

30th October 2007

Finally the day came to get the steel unloaded, We hired a front loader to lift the boat from the truck.


David (9) Adam (2) and Dara (5) waiting patiently for a truck to arrive.

As usual we waited all day and had to fight to get it delivered that night so at 10:45 Pm a very annoyed driver came to town.. well he thought HE was annoyed till he met me!..

Patryk and Milo assisted the loading of the forks while I drove the machine. It took just over 2 hours to unload all 600+ pieces totalling more than 13 tons of metal. We had to floodlight the drive and light up the trailer. Only 1 piece of steel slightly bent, nothing a good hammer wont sort out.

Most of the lifts involved lifting 4 metre wide sheets of steel piled on top of each other over 4 metres high to clear the trees each side of the drive way. At least we wont have as much difficulty getting the boat out as it will be lifted out by a 130 ton crane. but thats another story.









The end result in daylight... now where to start!