Tampilkan postingan dengan label launch. Tampilkan semua postingan
Tampilkan postingan dengan label launch. Tampilkan semua postingan

Selasa, 04 Oktober 2016

Launch Tomorrow

Sorry I havent blogged much this week but Ive been very busy doing at least a thousand last minute pre launch jobs.

I have loads of photos and will get them up ASAP.

The loading from home will be streamed live all being well at the top of the blog.

The direct link should be HERE   or copy and paste  http://www.ustream.tv/channel/nivek-test

See you on the water.
Read More..

Minggu, 02 Oktober 2016

Launch Date Is Confirmed

After several phone calls too and fro with all parties I can confirm the launch date will be:-

Friday 16th March 2012
====================
Read More..

Rabu, 29 Juni 2016

The Launch Timeline

     I have a recurring dream where I finally make it out to the boat shop after weeks of neglect only to find the place blanketed in Texas dust and the keel looking like Swiss cheese due to termite damage. A few of the frames are but piles of sawdust. Rather than feeling horrified, I feel relieved. I walk back to the house and order plans for a smaller boat and start packing my things.
     Lately, Ive felt defeated by the size of this project. Previously, I tried not to set a time frame for this project because I felt like I had no realistic idea of how long this thing would take me-- and I didnt want to stress about it. But now, for my own sanity, I need a timeline to launch. Ramon and I sat down last night and hatched our plan:

2013
January: Stringers, chine, and cheeks installed
February: Frames, stringers, chine faired; chamfer on bow and stern
March: Deck beams installed, footwell framed, hatch framed
April: cabin trunk "cutout"? framed
June: Planking complete, deck laid, hull glassed
July: Install bulwarks, start working on interior
August: Hatches complete, cabin trunk completed and glassed, paint

Beginning of September, 2013: The launch!  
Also-- our last days here!

We plan to live near Port Isabel and finish Lunas interior at the marina while I finish up my masters program. 

Depending on how long funds last, and how long it takes to outfit her, we hope to set sail by the end of 2013. Thats only a little over a year away, making it a pretty ambitious (foolhardy?) goal, but it feels good to have something to work toward.

Also-- today I finished squaring up the frames! The next step will be  installing the chine.
Read More..

Minggu, 05 Juni 2016

Launch Day July 20 2011

The launch day and time were set for 7/20/11 at 5:00 pm at Teds house. Ted arranged for the Oakland Press to come with video and do a story on our boat builds...so we were committed. Meanwhile, back at the ranch, I had a Board meeting to conduct on the night before and an un-completed boat. I got home about 10:00 pm and Vicky helped me finish up the cleat mountings, hatch installation, fuel tank tie-downs, fire extinquisher mounting and by 12:30 am, it was ready...I hoped.












Ted and friends helped with the launch as I have very little experience in trailer backing etc. So they put me in the cockpit and backed me in the water. It floats...drain plugs were checked more than once! I hadnt run the motor since last summer, so with a fresh tank of fuel, a choke and a few pulls it fired up. So that potential embassment was avoided.






































I was idling and waiting for Ted to launch his Zip. After he was in the water and running, I had Vicky climb aboard and we were off for our first boat ride!


I went out in lake and opened her up. It seemed a little reluctant to come up on plane so by standing up and leaning forward it sped up and we were flying. The lake was a bit rough but the boat handled it better than Vicky, and I was smiling. Well have to get some pictures of the boat in motion another time, especially since after a couple of laps around the lake, the forward motion slowed and the motor sped up....not a good sign. I limped in to Teds dock and put it on a small hoist he had put in for me to use if needed. After we all had pizza, Ted and I took off the prop and confirmed that everything looks OK but another quick drive of the boat confirmed that I have a "spun" prop. As the boat started to come up on plane, the slip returned. Apparently the bronze splined bearing inside the prop slips under torque load and needs to be repaired. At least I got a lot of comments from people about how much they liked my boat and the classic motor! So Ted found a place that I can get it repaired while we head up north for a planned weekend and go look at other wooden boats.


Here is a picture of Ted and his wife Lynn in their Glen-L Zip which he completed and launched along with me. With a recent motor change at the end of his build, Ted has a very beautiful and nice running boat.






Read More..
 
boat design plans - Powered By Blogger