![](http://primarybook.net/images/bannerupbp01.gif)
So I went to newly concocted Plan B, which was using a 90 degree corner form with a radius to match the bow point. With this set up, the rub strip was bent a bit too much, but with a pipe clamp turned into a pusher, I pushed the sucker into place. Then marked the screw holes with an awl, drilled pilot holes and screwed it in place. Then rest of the side rub strips
followed....albeit it slowly...one hole at a time.
Each side was done with two 6 pieces as I was too cheap to pay the ridiculous shipping costs of 12 pieces. In the end, it all worked out as it would have been nearly impossible to handle 12 pieces and do the finesse work at the ends.
The end at the transom was finished with a formed end like the splash rails. I think I may add another screw hole about an inch from the aft end as there about 3" of rub strip past the last screw and it might be subject to getting caught up on something and bent.
I couldnt be happier with the look of the rub strips. All my worry beads about the look at the bow, the joint fits, and end treatment have been taken care of.
![](http://primarybook.net/images/bannerdnbp01.gif)
0 komentar:
Posting Komentar